2000-2009
Alternation Works of Existing Two Numbers of Temporary Kiosks, The Venetian, Cotai Strip, Macau

Construction of Pre-OP Works at Retailer Space 1038 at The Venetian Cotai Strip, Macau

Fitting Out Works for Retail Unit 1129A, Sundry Shop, Venetian Cotai, Parcel 2, Macau

Retail Unit Fitting Out Works 1 for Champagne Bar - Parcel 2 for Work Package 25105

Fitting Out Works for No Signboard Seafood at Shop 2132 at Grand Canal Shoppes, Venetian Macau

Construction and Completion of Pool Deck Substructure (including plant rooms) (Package No. WP24220) for Parcel 2 Cotai Resort Development, Cotai, Macau

Fitting Out Works for Fogo Samba at Retailer Space 2412 and 3009 sites at The Venetian, Cotai Strip, Macau

Jade Casino ABWF & Miscellaneous Works - Package No. WP4243, The Venetian, Cotai Strip, Macau

Fitting Out Works (Decorative Lighting) for Chinese Restaurant at Shop 1018, The Venetian, Cotai Strip, Macau

Fitting-Out Works for Travel Office at Shop 1028, The Venetian, Cotai Strip, Macau

Construction the Structural of Mezzanine for Fogo Samba at Retailer Space 3009 site at The Venetian, Cotai Strip Macau

Fitting Out Works at Retailer Space 1015 site at The Venetian, Cotai Strip, Macau (Roka Japanese Restaurant)

Fitting Out Works for Morton's the Steakhouse, Unit 1016 at Venetian, Macau

Construction on Mezzanine Floor at Level One, Unit 1037, Venetian, Macau

Fitting Out Works for Podium L5 and UL5 BOH, Venetian, Macau (Work Package No. 4250)